Maintenance case study
Five years.
Ongoing care.
An annual maintenance visit to an iCO water mist system in a two-bedroom flat with an open-plan kitchen and living area.
Dorking · Residential · iCO
The installation
The iCO system was installed five years before this visit. TM Services has returned annually to maintain it throughout that period.
The work
On this visit, the team updated the main control board, replaced the flow switch and recommissioned the system.
Looking ahead
Regular visits help the owner keep track of the system’s condition and maintenance history. If you have an existing iCO system, send us its details and last service date so we can discuss ongoing care.
Project account · November 2026. The work described relates to this installation.
More from our teamA clear next step
Arrange care for your system.
Tell us the property location, system make and last service date.
